281-871-1752 · Houston-based team
AQM Doors and Hardware — Commercial Metal & Wood Doors, Houston, TexasBuild a Quote

Compliance library

Documentation for every opening.

Every product we sell is backed by independent certification. Download the latest UL, BHMA, and ADA/TAS data sheets for your submittal package — or request a project-specific compliance bundle with your quote.

Note: Download links below are placeholders. Drop the real PDFs into public/compliance/ and update the href on each card to enable downloads.

Fire & Life Safety

UL 10C — Positive Pressure Fire Door Assembly

Independent UL certification for our hollow metal door and frame assemblies up to 3-hour fire ratings. Required for stairwells, corridors, and rated separations.

UL_10C_HollowMetal.pdf — 1.2 MBDownload PDF

UL 1784 — Air Leakage (Smoke-rated openings)

Test report for smoke and draft control assemblies used in healthcare and high-rise corridors.

UL_1784_SmokeRated.pdf — 880 KBDownload PDF

Hardware

BHMA / ANSI A156.2 — Grade 1 Locks & Latches

Cycle and strength test results for our Grade 1 cylindrical and mortise lock lines.

BHMA_A156_2_Grade1.pdf — 1.5 MBDownload PDF

BHMA / ANSI A156.4 — Door Closers

Performance certification for our surface-mounted and concealed door closer line.

BHMA_A156_4_Closers.pdf — 1.1 MBDownload PDF

BHMA / ANSI A156.3 — Panic & Exit Devices

Grade 1 panic device test reports — fire-rated and non-rated configurations.

BHMA_A156_3_Exit.pdf — 1.4 MBDownload PDF

Accessibility

ADA — Americans with Disabilities Act

Reference sheet for opening force, threshold height, hardware reach range, and clear-width compliance on our standard kits.

ADA_Compliance_Reference.pdf — 640 KBDownload PDF

TAS — Texas Accessibility Standards

TAS-specific compliance data for Texas commercial projects. Aligned with ADA but includes Texas-specific requirements.

TAS_TexasCompliance.pdf — 720 KBDownload PDF

Sustainability

LEED / Material Health Declarations

VOC, recycled content, and material declarations for projects pursuing LEED credits.

LEED_MaterialDeclarations.pdf — 950 KBDownload PDF

Need a project-specific submittal package?

Send us your door schedule or plan set. We'll return a complete submittal with the right compliance docs for every opening — usually within one business day.